A request to install a new reception screen at St Giles House. This centre provides assessments & short-term treatment for people needing mental health support.
Further to our recent works at Lister. We were asked to repair or replace the doors to the Plant Storage Room and make secure. Remove existing double door set & dispose of.Supply & install 1 aluminium double door set (door
A further request to continue work at the Care Centre. This time, a refurbishment of the lobby and staircase to freshen up the communal areas. Staircases & Lobby Decorations: Erect mobile staircase towers for safe working access.Rub down, prepare all
A request to make good the shower room floor on the 2nd level of the care centre. Uplift existing flooring & dispose of.Prepare & latex sub floor.Supply & lay new Polysafe vinyl flooring (grey) with cap & cove skirting.Heat weld
We were asked to carry out garden maintenance and clearance at a Health Centre. Carry out strimmer removal to exiting overgrown shrubs & bushes. Remove high level grass using lawnmower & strimmer to entire garden area & side alley. Remove
The partitioning under the stairs has been badly damaged & requires replacing. We were asked to complete this in a timely fashion Supply & install new metal stud at 400 centres fitted onto a top & bottom track.Supply & install
CSF were extremely excited to be offered the opportunity to completely remodel and refurbish a clients house. This extensive project consisted of and included taking down bearing walls, demolishing existing areas and tailoring the build to the clients requirements and
The existing bathroom has bad mould on the ceiling due to bad ventilation, this has got into the slats in the airing cupboard & the grain of the veneer doors. Request to clean, repair and refurbish whole bathroom.
CSF completed multiple projects for Hayesbrook during the summer break. These incuded: Bike Shelter, Court Yard, 868 Perimeter Fencing, Science Classroom full refurbishment. All projects were completed to the academy’s specifications and on time ready for the new school year.
CSF carried out a full redecoration of the school hall from walls, ceiling, woodwork & metal work. Whilst carrying out the decoration we removed existing timber framed windows & installed new aluminium powder coated windows in white with Teleflex openers.
Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion
To transform five terraced houses built in 1776 into a four star 49 bedroom luxury hotel with library,reception,lounge,bar,two courtyards and a breakfast/buffet/ dining area and kitchen in basement.