The existing bathroom has bad mould on the ceiling due to bad ventilation, this has got into the slats in the airing cupboard & the grain of the veneer doors. Request to clean, repair and refurbish whole bathroom.
CSF completed multiple projects for Hayesbrook during the summer break. These incuded: Bike Shelter, Court Yard, 868 Perimeter Fencing, Science Classroom full refurbishment. All projects were completed to the academy’s specifications and on time ready for the new school year.
CSF carried out a full redecoration of the school hall from walls, ceiling, woodwork & metal work. Whilst carrying out the decoration we removed existing timber framed windows & installed new aluminium powder coated windows in white with Teleflex openers.
Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion
To transform five terraced houses built in 1776 into a four star 49 bedroom luxury hotel with library,reception,lounge,bar,two courtyards and a breakfast/buffet/ dining area and kitchen in basement.