To completely replace the bin compound for new

Duration: 2 days

• Remove & dispose of existing bin compound & posts from site.
• Infill existing floor where posts have been removed with cold lay tarmac repair.
• This will be erected at the end of car park outside underground car park.
• Supply & fit 6 4×4 wooden posts.
• 4 to be fitted into a metal post shoe & bolted to the ground.
• 2 to be bolted to the walls.
• Close boarded fence panels 6ft high will be fitted between fence posts with a double gate fitted so new compound will be secure.
• Relevant ironmongery to be fitted including digi-lock.
• Supply & fit Polycarbonate roof fitted to a timber frame.
• Aluminium glazing bars will be screwed to the timber supports with capping & will hold the Polycarbonate sheets in place.
• All waste to be removed from site into a licensed waste station.

Norbury Health Centre, London – New Bin Compound