Project: Refurbish existing kitchenette

Duration: 6 days

Description

  • • Isolate water supply.
  • • Carefully remove pipework to sink & water heater that pass through the worktop.
  • • Remove existing base & wall units along with sink & taps/dispose of.
  • • Uplift existing vinyl flooring & dispose of.
  • • 2 DSO blanking plates to be removed & wiring to be isolated & removed back to consumer unit.
  • • Check all other sockets & fused spurs in kitchen area to make sure they are compliant.
  • • Latex sub floor.
  • • Supply & install new Polysafe vinyl flooring (colour TBC) with cap & cove over the existing skirting.
  • • Supply & install new Greenwich white gloss x2 1000 drawer line base unit, x2 600 base units & x2 1000 wall units.
  • • Supply & install new worktops with stainless steel sink cut into worktop with lever handle mixer taps fitted.
  • • Remove existing tiled splashback & dispose of.
  • • Supply & install new whiterock splashback above new worktops.
  • • All pipework & wastes to be reconnected.
  • • Silicone seal where necessary.
  • • Rub down & prepare walls in kitchen ready for decoration.
  • • Apply 2 coats of Dulux diamond matt emulsion (white) to walls.
  • • Remove damaged or stained ceiling tiles & dispose of.
  • • Supply & install new tegulated tiles for microgrid.
  • • All works completed in 6 days & handed back to client ready for use following day.
St Giles Health Centre – New Kitchenette