A request to repaint the plant room with tanking membrane.
Lister Primary Care Centre – Plant Room Tanking

A request to repaint the plant room with tanking membrane.
A request to renovate the flooring in the waiting area, reception, office and adjoining corridors
A request from the Health Centre to decorate the corridors and main waiting room.
A complete staff kitchen refurbishment.
A request from our client to restore external fire escape stairs and bring back to original condition.
Kenwood Medical Centre – New Fascia repair with decoration.
Woodside Health Centre – Stair Nosings
Gallions Health Centre – Emergency Window Repair
A request to replace the Health Centre front door.
A small project to remove unsightly graffiti and restore to original condition.
We were asked to remove the old, dilapidated fence and replace with new fence panels, Arris rails, kick boards and edge boards.
Croydon University Hospital – Mayday, new kitchen
Request to remove old floor and install new Polysafe vinyl in male and female toilets.
Request to board and make secure property as no longer needed for services.
Request to update, remove and replace fire door to boiler room. FD30 fire door required.
The existing bathroom has bad mould on the ceiling due to bad ventilation, this has got into the slats in the airing cupboard & the grain of the veneer doors. Request to clean, repair and refurbish whole bathroom.
Request to clean and repair roof to make sure no standing water be left on roof. Carry out test to make sure water flowing freely.
Complete refurbishment of both the ladies and gentlemen toilet area at Gatton Place. All works completed within 4 weeks timescale.
To remove old flooring and replace with new polyflor vinyl.
We were requested to renovate and modernise 3 rooms while making sure they meet the required health and safety regulations.
A small project to redraw line markings in the carpark using thermoplastic paint.
A project to remove the existing kitchen and install a brand new up to date kitchen complete with new technology, fixtures and fittings.
A small project to renovate and make better use of an outdoor space.
To supply and install a new FD30 fire door.
To supply, build and install new bin store.
To clean and refurbish external staircase.
To undertake a fire risk assessment and complete remedial works on fire door and install vision panels.
To remove old splashbacks and install whiterock splashbacks.
To carry out masonry repairs to stairs and fully decorate.
To supply and install two Armco barriers.
Original car park & disabled line markings have faded away & require re-lining.
To remove and replace asbestos ceiling and make room usable again.
To update and refurbish classrooms 216 and 315 as per the academy’s instructions. Colour coded and matching the rest of the classrooms decor.
Replace and repair Bin Store
To clear, clean and install new kitchenette in porters area (including new floor). Replace all fixtures and fittings.
To completely replace the bin compound for new.
To replace the external handrail while keeping the style of the original.
To supply, deliver & install a galvanised access ladder system from floor for access to roof and a galvanised free standing handrail.
Complete check and restoration of roof.
Complete classroom renovation including refurbishing parquet floor.
Light up the Hospital showing solidarity to various communities via different colours.
Lower Clapton Health Centre – New Height Restrictor Barrier
Arjo Bath Therapy Room to Physio Room Conversion
Corridor refurbishment carried out on walls & woodwork.
Refurbish Kitchenette
Complete Renovation of John Scott Health Centre Hall with repair and complete refurbishment of parquet flooring.
JCOSS Washroom Complete Refurbishment.
St Saviours & St Olaves School – Landscape Project
Bethlem Hospital Multiple Projects
Fence Panel Replacement, Birches Polyclinic Health Centre
St Leonards Hospital – Male WC Hand Basin Replacement
Ground Floor, Complete Corridor flooring replacement
Renovation of 8 classrooms to be completed within two weeks.
To replace and make good external rainwater goods and fire escape staircase.
Laundry room conversion to new Mothers & Baby Unit Kitchenette
To clear, clean and refurbish 3 consulting rooms and make ready for COVID-19 work areas.
To Supply and install 2 COVID screen protectors in Library.
To supply and install new veneer fire doors and integrate with current security measures.
To Supply and install a protective sheet screen to canteen area.
To supply and install full shelving and make ready for a COVID-19 PPE storage room.
To clear, install and make ready a COVID-19 Isolation Room. 72 hour timescale.
To supply, deliver and install Coronavirus Testing Stations. 24 hour timescale.
Car Parking Line Refurbishment Re-line car park line markings with thermoplastic paint to parking bays & disabled bays.
To complete multiple projects including full ground floor, sports hall and classroom refurbishment.
Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion
Phase 3 café & ground floor refurbishment
Newly formed constructed domestic basement dwelling.
Anti-ligature refresh to Ladywell Unit on Clare, Powell, Hayworth, Wharton & Johnson wards.
Demolition of nursery at Purley School and installation of car park to maximise space.