Complete refurbishment of both the ladies and gentlemen toilet area at Gatton Place. All works completed within 4 weeks timescale.
EPUT. Gray’s Hall – Polyflor vinyl flooring replacement
To remove old flooring and replace with new polyflor vinyl.
Unither House Psychiatric Health Services – 3 Room Renovation.
We were requested to renovate and modernise 3 rooms while making sure they meet the required health and safety regulations.
Lower Clapton Health Centre – Line Markings
A small project to redraw line markings in the carpark using thermoplastic paint.
Sheilings – St Ebba’s Hospital – Kitchen Refurbishment
A project to remove the existing kitchen and install a brand new up to date kitchen complete with new technology, fixtures and fittings.
Canvey Health Centre – External Seating Area
A small project to renovate and make better use of an outdoor space.
St Dunstan College – Fire Door Set
To supply and install a new FD30 fire door.
Oxlow Lane Health Centre – New Bin Store
To supply, build and install new bin store.
Rayleigh Health Centre – External Decorations
To clean and refurbish external staircase.
York Road Project – Fire Risk Assessment & Fire Door Remedial Works
To undertake a fire risk assessment and complete remedial works on fire door and install vision panels.
Hockley Health Centre – podiatry rooms 1 & 2
To remove old splashbacks and install whiterock splashbacks.
Lena Peat Resource Centre – external works
To carry out masonry repairs to stairs and fully decorate.
Canvey Health Centre – Armco Safety Barriers
To supply and install two Armco barriers.
Oxlow Lane Health Centre – line markings
Original car park & disabled line markings have faded away & require re-lining.
Albion Street Group Practice – staff room: ceiling & wall decoration
To remove and replace asbestos ceiling and make room usable again.
Harris Academy Wimbledon classroom refurbishment
To update and refurbish classrooms 216 and 315 as per the academy’s instructions. Colour coded and matching the rest of the classrooms decor.
Somerford Health Centre Waste Bin Store New Roof
Replace and repair Bin Store
Maudsley Hospital, Denmark Hill, London – Porters Area Refurbishment
To clear, clean and install new kitchenette in porters area (including new floor). Replace all fixtures and fittings.
Norbury Health Centre, London – New Bin Compound
To completely replace the bin compound for new.
The Kings School, Harpenden – External Handrail Replacement
To replace the external handrail while keeping the style of the original.
Fullwell Cross Health Centre – Installation of Cat Ladder & Handrail System
To supply, deliver & install a galvanised access ladder system from floor for access to roof and a galvanised free standing handrail.
John Scott Health Centre Roof Repairs
Complete check and restoration of roof.
St Saviour’s & St Olave’s Church of England School – Classroom Refurbishment
Complete classroom renovation including refurbishing parquet floor.
St Leonards Hospital – Main Entrance Lighting
Light up the Hospital showing solidarity to various communities via different colours.
Lower Clapton Health Centre – New Height Restrictor Barrier
Lower Clapton Health Centre – New Height Restrictor Barrier
Farnham Hospital – Bath Therapy Room conversion to Physio Room
Arjo Bath Therapy Room to Physio Room Conversion
Birches Polyclinic – Corridor Decorations
Corridor refurbishment carried out on walls & woodwork.
St Giles Health Centre – New Kitchenette
Refurbish Kitchenette
John Scott Health Centre Hall Renovation
Complete Renovation of John Scott Health Centre Hall with repair and complete refurbishment of parquet flooring.
JCOSS Washroom Refurbishment
JCOSS Washroom Complete Refurbishment.
St Saviours & St Olaves School – Landscape Project
St Saviours & St Olaves School – Landscape Project
Bethlem Hospital – Electric Car Charging Point Install
Bethlem Hospital Multiple Projects
Birches Polyclinic Health Centre, Mitcham
Fence Panel Replacement, Birches Polyclinic Health Centre
St Leonards Hospital – Male WC Hand Basin Replacement
St Leonards Hospital – Male WC Hand Basin Replacement
St Leonard’s Hospital – Ground Floor, Corridor Flooring replacement
Ground Floor, Complete Corridor flooring replacement
Harris Primary Academy (Kenley) Classroom Renovation
Renovation of 8 classrooms to be completed within two weeks.
Wilson Hospital – External rainwater goods & fire escape staircase replacement works 2021
To replace and make good external rainwater goods and fire escape staircase.
South London & Maudsley NHS New Mother & Baby Unit Kitchenette
Laundry room conversion to new Mothers & Baby Unit Kitchenette
Beckenham Health Clinic Consulting Room Refurbishment
To clear, clean and refurbish 3 consulting rooms and make ready for COVID-19 work areas.
JCOSS School – Library COVID Cough Screens
To Supply and install 2 COVID screen protectors in Library.
Harris Kenley – new veneer reception doors
To supply and install new veneer fire doors and integrate with current security measures.
Bethlem Hospital – Covid polycarbonate cough screen
To Supply and install a protective sheet screen to canteen area.
Bethlem Hospital – Covid storage room
To supply and install full shelving and make ready for a COVID-19 PPE storage room.
Bethlem Hospital – Isolation Room
To clear, install and make ready a COVID-19 Isolation Room. 72 hour timescale.
Coronavirus Testing Station Installation
To supply, deliver and install Coronavirus Testing Stations. 24 hour timescale.
Mountnessing Court Health Centre
Car Parking Line Refurbishment Re-line car park line markings with thermoplastic paint to parking bays & disabled bays.
St Ignatius Expansive Project.
To complete multiple projects including full ground floor, sports hall and classroom refurbishment.
Harris Primary School (Crystal Palace) – Hall Project. 2019
Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion
Ladywell Unit, Lewisham – Phase 3 café & ground floor refurbishment
Phase 3 café & ground floor refurbishment
Domestic basement dwelling
Newly formed constructed domestic basement dwelling.
Purley School Car Park
Demolition of nursery at Purley School and installation of car park to maximise space.