A request to update, repair and replace a kitchen for our customer. A quick turnaround was needed to ensure staff could carry on using while at work.
Balham Health Centre – Kitchen Replacement


A request to update, repair and replace a kitchen for our customer. A quick turnaround was needed to ensure staff could carry on using while at work.

CSF were extremely excited to be offered the opportunity to completely remodel and refurbish a clients house. This extensive project consisted of and included taking down bearing walls, demolishing existing areas and tailoring the build to the clients requirements and

We were asked to design and install some bedroom storage while making room for a TV. Finished with Shaker doors and solid oak soft close draws.

A request from one of our customers to install new flooring on the front stairs and landing of the health centre.

CSF are pleased to be appointed to turn a green grass area into a relaxing Therapy/Sensory garden for the local community.

To replace flooring, nosings and make safe Health Centres stairs.

To install new reception screens in a short period of time.

A request to repaint the plant room with tanking membrane.

A request to renovate the flooring in the waiting area, reception, office and adjoining corridors

A request from the Health Centre to decorate the corridors and main waiting room.

A complete staff kitchen refurbishment.

A request from our client to restore external fire escape stairs and bring back to original condition.

Kenwood Medical Centre – New Fascia repair with decoration.

Woodside Health Centre – Stair Nosings

Gallions Health Centre – Emergency Window Repair

A request to replace the Health Centre front door.

A small project to remove unsightly graffiti and restore to original condition.

We were asked to remove the old, dilapidated fence and replace with new fence panels, Arris rails, kick boards and edge boards.

Croydon University Hospital – Mayday, new kitchen

Request to remove old floor and install new Polysafe vinyl in male and female toilets.

Request to board and make secure property as no longer needed for services.

Request to update, remove and replace fire door to boiler room. FD30 fire door required.

The existing bathroom has bad mould on the ceiling due to bad ventilation, this has got into the slats in the airing cupboard & the grain of the veneer doors. Request to clean, repair and refurbish whole bathroom.

Request to clean and repair roof to make sure no standing water be left on roof. Carry out test to make sure water flowing freely.

Complete refurbishment of both the ladies and gentlemen toilet area at Gatton Place. All works completed within 4 weeks timescale.

To remove old flooring and replace with new polyflor vinyl.

We were requested to renovate and modernise 3 rooms while making sure they meet the required health and safety regulations.

A small project to redraw line markings in the carpark using thermoplastic paint.

A project to remove the existing kitchen and install a brand new up to date kitchen complete with new technology, fixtures and fittings.

A small project to renovate and make better use of an outdoor space.

To supply and install a new FD30 fire door.

To supply, build and install new bin store.

To clean and refurbish external staircase.

To undertake a fire risk assessment and complete remedial works on fire door and install vision panels.

To remove old splashbacks and install whiterock splashbacks.

To carry out masonry repairs to stairs and fully decorate.

To supply and install two Armco barriers.

Original car park & disabled line markings have faded away & require re-lining.

To remove and replace asbestos ceiling and make room usable again.

To update and refurbish classrooms 216 and 315 as per the academy’s instructions. Colour coded and matching the rest of the classrooms decor.

Replace and repair Bin Store

To clear, clean and install new kitchenette in porters area (including new floor). Replace all fixtures and fittings.

To completely replace the bin compound for new.

To replace the external handrail while keeping the style of the original.

To supply, deliver & install a galvanised access ladder system from floor for access to roof and a galvanised free standing handrail.

Complete check and restoration of roof.

Complete classroom renovation including refurbishing parquet floor.

Light up the Hospital showing solidarity to various communities via different colours.

Lower Clapton Health Centre – New Height Restrictor Barrier

Arjo Bath Therapy Room to Physio Room Conversion

Corridor refurbishment carried out on walls & woodwork.

Refurbish Kitchenette

Complete Renovation of John Scott Health Centre Hall with repair and complete refurbishment of parquet flooring.

JCOSS Washroom Complete Refurbishment.

St Saviours & St Olaves School – Landscape Project

Bethlem Hospital Multiple Projects

Fence Panel Replacement, Birches Polyclinic Health Centre

St Leonards Hospital – Male WC Hand Basin Replacement

Ground Floor, Complete Corridor flooring replacement

Renovation of 8 classrooms to be completed within two weeks.

To replace and make good external rainwater goods and fire escape staircase.

Laundry room conversion to new Mothers & Baby Unit Kitchenette

To clear, clean and refurbish 3 consulting rooms and make ready for COVID-19 work areas.

To Supply and install 2 COVID screen protectors in Library.

To supply and install new veneer fire doors and integrate with current security measures.

To Supply and install a protective sheet screen to canteen area.

To supply and install full shelving and make ready for a COVID-19 PPE storage room.

To clear, install and make ready a COVID-19 Isolation Room. 72 hour timescale.

To supply, deliver and install Coronavirus Testing Stations. 24 hour timescale.

Car Parking Line Refurbishment Re-line car park line markings with thermoplastic paint to parking bays & disabled bays.

To complete multiple projects including full ground floor, sports hall and classroom refurbishment.

CSF completed multiple projects for Hayesbrook during the summer break. These incuded: Bike Shelter, Court Yard, 868 Perimeter Fencing, Science Classroom full refurbishment. All projects were completed to the academy’s specifications and on time ready for the new school year.

CSF carried out a full redecoration of the school hall from walls, ceiling, woodwork & metal work. Whilst carrying out the decoration we removed existing timber framed windows & installed new aluminium powder coated windows in white with Teleflex openers.

Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion

To transform five terraced houses built in 1776 into a four star 49 bedroom luxury hotel with library,reception,lounge,bar,two courtyards and a breakfast/buffet/ dining area and kitchen in basement.

Toilet cubicle replacement, floor replacement, wall protection, light replacement & full redecoration.

Refurbishment of Car Park, Art Classroom, Library, Fire Doors.

Full refurbishment to science labs – stripping out existing lighting, plumbing, worktops, flooring and full redecoration to the classroom

Redecoration of corridor and lobby

South Lewisham Health Centre refurbishment works

Swimming pool demolition to create new playground surface

Boys & Girls toilets conversion at Harris Primary Academy, Kent House

Boys & Girls toilet refurbishment at Harris Primary Academy

Full refurbishment to the entire SEPT office building

Redecoration and playground fencing at Meeching Valley Primary School

Redecoration and soundproofing at Hawkes Farm Primary School

Remove existing chain link fence and replace with vandal resistant perimeter fencing

Remove & demolish empty caretaker’s building at Hayesbrook Academy

New brushed stainless steel balustrade at Hayesbrook Academy

Car park resurfacing at Hayesbrook Academy

Redecoration over Ground & 1st floor corridors of Hayesbrook Academy

Fire door works at Harris Primary Academy

Installing removable traffic stainless steel bollards at University College London Hospital

Women Services & Gynaecology Ward

Various works carried out at Harris Academy, Merton

Phase 3 café & ground floor refurbishment

Full refurb of classroom at Hayesbrook School

Conversion of toilet cubicles at Hayesbrook School

Newly formed constructed domestic basement dwelling.

Anti-ligature refresh to Ladywell Unit on Clare, Powell, Hayworth, Wharton & Johnson wards.

Fire exit staircase enclosures & MRI removal of redundant material & recover existing roof.

Full redecoration of the school gym at Kenley Primary School in Corydon.

Full redecoration and refurbishment service for Benson Primary School in Croydon.

Store care and maintenance contract within Marks and Spencer’s stores throughout the UK.

Various alterations and redecoration of rooms and function areas of Grosvenor House Hotel in Mayfair, London.

Alterations and roofing work to The Dorchester Hotel in Park Lane, London.

Maternity ward refurbishment at Lewisham Hospital.

Demolition of nursery at Purley School and installation of car park to maximise space.