We wre asked to design and install some bedroom storage while making room for a TV. Finished with Shaker doors and solid oak soft close draws.
Phoenix Resource Health Centre – New Staircase Flooring

A request from one of our customers to install new flooring on the front stairs and landing of the health centre.
Thundersley Health Clinic – Sensory Garden for children, young people and families.

CSF are pleased to be appointed to turn a green grass area into a relaxing Therapy/Sensory garden for the local community.
Seven Kings Health Centre – stairwell nosings/landing

To replace flooring, nosings and make safe Health Centres stairs.
Harold Moody Health Centre – New Reception Screens

To install new reception screens in a short period of time.
Lister Primary Care Centre – Plant Room Tanking

A request to repaint the plant room with tanking membrane.
St Leonard’s Hospital: Louie Freeman Building – (flooring)

A request to renovate the flooring in the waiting area, reception, office and adjoining corridors
Manor Drive Health Centre – Internal Decorations

A request from the Health Centre to decorate the corridors and main waiting room.
6 Simpson Close – Staff Kitchen Refurbishment

A complete staff kitchen refurbishment.
Gallions Reach Medical Health Centre – Fire Escape Staircases

A request from our client to restore external fire escape stairs and bring back to original condition.
Kenwood Medical Centre – New fascia repairs & decorations

Kenwood Medical Centre – New Fascia repair with decoration.
Woodside Health Centre – Stairs Nosings

Woodside Health Centre – Stair Nosings
Gallions Health Centre – Emergency Window Repair

Gallions Health Centre – Emergency Window Repair
Vange Health Centre – Podiatry new automated entrance door

A request to replace the Health Centre front door.
South Woodford Health Centre – graffiti damage

A small project to remove unsightly graffiti and restore to original condition.
Birches Close HC – Fence Replacement

We were asked to remove the old, dilapidated fence and replace with new fence panels, Arris rails, kick boards and edge boards.
Croydon University Hospital – Mayday, new kitchen

Croydon University Hospital – Mayday, new kitchen
Greenwich Peninsula Health Centre – Flooring: male & female WCs.

Request to remove old floor and install new Polysafe vinyl in male and female toilets.
Croydon Road – Property Boarding up Services

Request to board and make secure property as no longer needed for services.
Broad Green Health Centre – Boiler Room Fire Door Replacement

Request to update, remove and replace fire door to boiler room. FD30 fire door required.
Croydon Health Services NHS Trust. Bathroom Refurbishment

The existing bathroom has bad mould on the ceiling due to bad ventilation, this has got into the slats in the airing cupboard & the grain of the veneer doors. Request to clean, repair and refurbish whole bathroom.
Brocklebank Health Centre- Roof Repair and Clean

Request to clean and repair roof to make sure no standing water be left on roof. Carry out test to make sure water flowing freely.
Gatton Place – WCs Refurbishment 2024

Complete refurbishment of both the ladies and gentlemen toilet area at Gatton Place. All works completed within 4 weeks timescale.
EPUT. Gray’s Hall – Polyflor vinyl flooring replacement

To remove old flooring and replace with new polyflor vinyl.
Unither House Psychiatric Health Services – 3 Room Renovation.

We were requested to renovate and modernise 3 rooms while making sure they meet the required health and safety regulations.
Lower Clapton Health Centre – Line Markings

A small project to redraw line markings in the carpark using thermoplastic paint.
Sheilings – St Ebba’s Hospital – Kitchen Refurbishment

A project to remove the existing kitchen and install a brand new up to date kitchen complete with new technology, fixtures and fittings.
Canvey Health Centre – External Seating Area

A small project to renovate and make better use of an outdoor space.
St Dunstan College – Fire Door Set

To supply and install a new FD30 fire door.
Oxlow Lane Health Centre – New Bin Store

To supply, build and install new bin store.
Rayleigh Health Centre – External Decorations

To clean and refurbish external staircase.
York Road Project – Fire Risk Assessment & Fire Door Remedial Works

To undertake a fire risk assessment and complete remedial works on fire door and install vision panels.
Hockley Health Centre – podiatry rooms 1 & 2

To remove old splashbacks and install whiterock splashbacks.
Lena Peat Resource Centre – external works

To carry out masonry repairs to stairs and fully decorate.
Canvey Health Centre – Armco Safety Barriers

To supply and install two Armco barriers.
Oxlow Lane Health Centre – line markings

Original car park & disabled line markings have faded away & require re-lining.
Albion Street Group Practice – staff room: ceiling & wall decoration

To remove and replace asbestos ceiling and make room usable again.
Harris Academy Wimbledon classroom refurbishment

To update and refurbish classrooms 216 and 315 as per the academy’s instructions. Colour coded and matching the rest of the classrooms decor.
Somerford Health Centre Waste Bin Store New Roof

Replace and repair Bin Store
Maudsley Hospital, Denmark Hill, London – Porters Area Refurbishment

To clear, clean and install new kitchenette in porters area (including new floor). Replace all fixtures and fittings.
Norbury Health Centre, London – New Bin Compound

To completely replace the bin compound for new.
The Kings School, Harpenden – External Handrail Replacement

To replace the external handrail while keeping the style of the original.
Fullwell Cross Health Centre – Installation of Cat Ladder & Handrail System

To supply, deliver & install a galvanised access ladder system from floor for access to roof and a galvanised free standing handrail.
John Scott Health Centre Roof Repairs

Complete check and restoration of roof.
St Saviour’s & St Olave’s Church of England School – Classroom Refurbishment

Complete classroom renovation including refurbishing parquet floor.
St Leonards Hospital – Main Entrance Lighting

Light up the Hospital showing solidarity to various communities via different colours.
Lower Clapton Health Centre – New Height Restrictor Barrier

Lower Clapton Health Centre – New Height Restrictor Barrier
Farnham Hospital – Bath Therapy Room conversion to Physio Room

Arjo Bath Therapy Room to Physio Room Conversion
Birches Polyclinic – Corridor Decorations

Corridor refurbishment carried out on walls & woodwork.
St Giles Health Centre – New Kitchenette

Refurbish Kitchenette
John Scott Health Centre Hall Renovation

Complete Renovation of John Scott Health Centre Hall with repair and complete refurbishment of parquet flooring.
JCOSS Washroom Refurbishment

JCOSS Washroom Complete Refurbishment.
St Saviours & St Olaves School – Landscape Project

St Saviours & St Olaves School – Landscape Project
Bethlem Hospital – Electric Car Charging Point Install

Bethlem Hospital Multiple Projects
Birches Polyclinic Health Centre, Mitcham

Fence Panel Replacement, Birches Polyclinic Health Centre
St Leonards Hospital – Male WC Hand Basin Replacement

St Leonards Hospital – Male WC Hand Basin Replacement
St Leonard’s Hospital – Ground Floor, Corridor Flooring replacement

Ground Floor, Complete Corridor flooring replacement
Harris Primary Academy (Kenley) Classroom Renovation

Renovation of 8 classrooms to be completed within two weeks.
Wilson Hospital – External rainwater goods & fire escape staircase replacement works 2021

To replace and make good external rainwater goods and fire escape staircase.
South London & Maudsley NHS New Mother & Baby Unit Kitchenette

Laundry room conversion to new Mothers & Baby Unit Kitchenette
Beckenham Health Clinic Consulting Room Refurbishment

To clear, clean and refurbish 3 consulting rooms and make ready for COVID-19 work areas.
JCOSS School – Library COVID Cough Screens

To Supply and install 2 COVID screen protectors in Library.
Harris Kenley – new veneer reception doors

To supply and install new veneer fire doors and integrate with current security measures.
Bethlem Hospital – Covid polycarbonate cough screen

To Supply and install a protective sheet screen to canteen area.
Bethlem Hospital – Covid storage room

To supply and install full shelving and make ready for a COVID-19 PPE storage room.
Bethlem Hospital – Isolation Room

To clear, install and make ready a COVID-19 Isolation Room. 72 hour timescale.
Coronavirus Testing Station Installation

To supply, deliver and install Coronavirus Testing Stations. 24 hour timescale.
Mountnessing Court Health Centre

Car Parking Line Refurbishment Re-line car park line markings with thermoplastic paint to parking bays & disabled bays.
St Ignatius Expansive Project.

To complete multiple projects including full ground floor, sports hall and classroom refurbishment.
Hayesbrook Academy 2019 Works.

CSF completed multiple projects for Hayesbrook during the summer break. These incuded: Bike Shelter, Court Yard, 868 Perimeter Fencing, Science Classroom full refurbishment. All projects were completed to the academy’s specifications and on time ready for the new school year.
Coleraine Academy Hall Refurbishment

CSF carried out a full redecoration of the school hall from walls, ceiling, woodwork & metal work. Whilst carrying out the decoration we removed existing timber framed windows & installed new aluminium powder coated windows in white with Teleflex openers.
Harris Primary School (Crystal Palace) – Hall Project. 2019

Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion
Academy Hotel

To transform five terraced houses built in 1776 into a four star 49 bedroom luxury hotel with library,reception,lounge,bar,two courtyards and a breakfast/buffet/ dining area and kitchen in basement.
Harris Academy – Orpington

Toilet cubicle replacement, floor replacement, wall protection, light replacement & full redecoration.
Hayesbrook Academy 2018 Works.

Refurbishment of Car Park, Art Classroom, Library, Fire Doors.
Hayesbrook Academy – Science labs refurbishment

Full refurbishment to science labs – stripping out existing lighting, plumbing, worktops, flooring and full redecoration to the classroom
Hayesbrook Academy – Corridor redecoration

Redecoration of corridor and lobby
South Lewisham Health Centre – Refurbishment

South Lewisham Health Centre refurbishment works
Harris Primary Academy, Merton

Swimming pool demolition to create new playground surface
Harris Primary Academy, Kent House – Toilet conversions + Fire alarm system

Boys & Girls toilets conversion at Harris Primary Academy, Kent House
Harris Primary Academy, Crystal Palace – Toilet conversion

Boys & Girls toilet refurbishment at Harris Primary Academy
SEPT – Castle Road, Rayleigh Office refurbishment

Full refurbishment to the entire SEPT office building
Meeching Valley Primary School

Redecoration and playground fencing at Meeching Valley Primary School
Hawkes Farm Primary School

Redecoration and soundproofing at Hawkes Farm Primary School
Hayesbrook Academy – Perimeter fencing

Remove existing chain link fence and replace with vandal resistant perimeter fencing
Hayesbrook Academy – Caretaker’s building demolition

Remove & demolish empty caretaker’s building at Hayesbrook Academy
Hayesbrook Academy – Reception Balustrade

New brushed stainless steel balustrade at Hayesbrook Academy
Hayesbrook Academy – Car park resurfacing

Car park resurfacing at Hayesbrook Academy
Hayesbrook Academy – Corridor / Staircase refresh decoration

Redecoration over Ground & 1st floor corridors of Hayesbrook Academy
Harris Primary Academy, Crystal Palace – Fire door works

Fire door works at Harris Primary Academy
Capita – UCLH, Beaumont Place W1 – Traffic Bollards

Installing removable traffic stainless steel bollards at University College London Hospital
Lewisham Hospital – Women Services & Gynaecology Ward 2016

Women Services & Gynaecology Ward
Harris Academy Merton – Summer works 2015

Various works carried out at Harris Academy, Merton
Ladywell Unit, Lewisham – Phase 3 café & ground floor refurbishment

Phase 3 café & ground floor refurbishment
Hayesbrook School – Classroom refurbishment

Full refurb of classroom at Hayesbrook School
Hayesbrook School – Toilet conversion

Conversion of toilet cubicles at Hayesbrook School
Domestic basement dwelling

Newly formed constructed domestic basement dwelling.
Ladywell Unit – Anti-ligature Refurbisment

Anti-ligature refresh to Ladywell Unit on Clare, Powell, Hayworth, Wharton & Johnson wards.
Staircase Enclosures & MRI Removal

Fire exit staircase enclosures & MRI removal of redundant material & recover existing roof.
Kenley Primary School Redecoration

Full redecoration of the school gym at Kenley Primary School in Corydon.
Benson Primary School Refurbishment

Full redecoration and refurbishment service for Benson Primary School in Croydon.
Marks & Spencer Store Care

Store care and maintenance contract within Marks and Spencer’s stores throughout the UK.
Grosvenor House Hotel Redecoration

Various alterations and redecoration of rooms and function areas of Grosvenor House Hotel in Mayfair, London.
Dorchester Hotel Alterations

Alterations and roofing work to The Dorchester Hotel in Park Lane, London.
Lewisham Hospital Maternity Ward

Maternity ward refurbishment at Lewisham Hospital.
Purley School Car Park

Demolition of nursery at Purley School and installation of car park to maximise space.