Supply & install a single veneer door & half leaf set between wall left of reception entrance complete with polished white ash frame & glazed borrowed light above frame to be installed from floor to ceiling Supply & install all
Supply & install 1 Polycarbonate sheet screen (clear) to canteen restaurant area. Reduce width of opening above food serving area to take Polycarbonate 3050×835 by fitting 100×25 prepared timber decorated white to either side of opening. The screen will be
Supply & install 6 rows of melamine shelving 600mm deep complete with spur racking, large uprights, joining clips & fixings to run along full length of right hand wall. This room once installed will be used for all COVID PPE
CSF were contacted on Friday 17th of April by our client to clear and install an Isolation Room over the weekend to be ready for use on Monday 20th April. Although it was a small window to complete the project,
Supply, Delivery and Installation of Coronavirus Testing Stations CSF are very proud to have been requested to support the NHS by recently supplying, delivering and installing two Coronavirus testing stations at Bethlem Royal Hospital following a verbal conversation request from
Ground Floor Decorations Rub down & prepare all walls, skirting, frames & borrowed light ready for decorations. Apply two coats of Dulux diamond matt emulsion to walls (colour TBC). Apply one undercoat & one top coat (colour TBC) to all
CSF completed multiple projects for Hayesbrook during the summer break. These incuded: Bike Shelter, Court Yard, 868 Perimeter Fencing, Science Classroom full refurbishment. All projects were completed to the academy’s specifications and on time ready for the new school year.
CSF carried out a full redecoration of the school hall from walls, ceiling, woodwork & metal work. Whilst carrying out the decoration we removed existing timber framed windows & installed new aluminium powder coated windows in white with Teleflex openers.
Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion
To transform five terraced houses built in 1776 into a four star 49 bedroom luxury hotel with library,reception,lounge,bar,two courtyards and a breakfast/buffet/ dining area and kitchen in basement.