Skip to content
CSF Building Contractors

CSF Building Contractors Ltd.

Menu

  • Home
  • Construction Services
    • Fire Doors Installation and Maintenance.
    • Schools / Colleges / Universities
    • Hospitals / Psychiatric Health Services
    • Hotel Renovation & Shopfitting
  • Projects & News
  • About Us
  • Contact Us

General Construction

JCOSS School – Library COVID Cough Screens

JCOSS School – Library COVID Cough Screens

Supply & install 2 Polycarbonate screens approx. 1675×900 & 1610×758 with radius corner & polished edges. 1 screen with cut out & polished edges. All screens to act as COVID screen protection

CSF 2nd November 20209th November 2020 General Construction, Schools / Colleges / Universities Read more

Harris Kenley – new veneer reception doors

Harris Kenley – new veneer reception doors

Supply & install a single veneer door & half leaf set between wall left of reception entrance complete with polished white ash frame & glazed borrowed light above frame to be installed from floor to ceiling Supply & install all

CSF 2nd November 20209th November 2020 Fire Door Installation and Maintenance, General Construction, Schools / Colleges / Universities Read more

Bethlem Hospital – Covid polycarbonate cough screen

Bethlem Hospital – Covid polycarbonate cough screen

Supply & install 1 Polycarbonate sheet screen (clear) to canteen restaurant area. Reduce width of opening above food serving area to take Polycarbonate 3050×835 by fitting 100×25 prepared timber decorated white to either side of opening. The screen will be

CSF 2nd November 20209th November 2020 General Construction, Hospitals / Psychiatric Health Services Read more

Bethlem Hospital – Covid storage room

Bethlem Hospital – Covid storage room

Supply & install 6 rows of melamine shelving 600mm deep complete with spur racking, large uprights, joining clips & fixings to run along full length of right hand wall. This room once installed will be used for all COVID PPE

CSF 2nd November 20209th November 2020 General Construction, Hospitals / Psychiatric Health Services Read more

Bethlem Hospital – Isolation Room

Bethlem Hospital – Isolation Room

CSF were contacted on Friday 17th of April by our client to clear and install an Isolation Room over the weekend to be ready for use on Monday 20th April. Although it was a small window to complete the project,

CSF 23rd April 20209th November 2020 General Construction, Hospitals / Psychiatric Health Services Read more

Coronavirus Testing Station Installation

Coronavirus Testing Station Installation

Supply, Delivery and Installation of Coronavirus Testing Stations CSF are very proud to have been requested to support the NHS by recently supplying, delivering and installing two Coronavirus testing stations at Bethlem Royal Hospital following a verbal conversation request from

CSF 15th April 202021st April 2020 General Construction, Hospitals / Psychiatric Health Services Read more

Mountnessing Court Health Centre

Mountnessing Court Health Centre

Car Parking Line Refurbishment Re-line car park line markings with thermoplastic paint to parking bays & disabled bays.

CSF 8th April 20208th April 2020 General Construction Read more

St Ignatius Expansive Project.

St Ignatius Expansive Project.

Ground Floor Decorations Rub down & prepare all walls, skirting, frames & borrowed light ready for decorations. Apply two coats of Dulux diamond matt emulsion to walls (colour TBC). Apply one undercoat & one top coat (colour TBC) to all

CSF 19th September 201919th September 2019 General Construction, Schools / Colleges / Universities Read more

Harris Primary School (Crystal Palace) – Hall Project. 2019

Harris Primary School (Crystal Palace) – Hall Project. 2019

Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion

CSF 14th May 201914th May 2019 General Construction, Schools / Colleges / Universities Read more

Ladywell Unit, Lewisham – Phase 3 café & ground floor refurbishment

Ladywell Unit, Lewisham – Phase 3 café & ground floor refurbishment

Phase 3 café & ground floor refurbishment

CSF 13th October 2015 General Construction Read more

Domestic basement dwelling

Domestic basement dwelling

Newly formed constructed domestic basement dwelling.

CSF 1st July 20157th July 2015 General Construction Read more

Pick a Project Category

  • Schools / Colleges / Universities
  • Hospitals / Psychiatric Health Services
  • Shopfitting & Hotels
  • General Construction

Recent Projects

  • JCOSS School – Library COVID Cough Screens
  • Harris Kenley – new veneer reception doors
  • Bethlem Hospital – Covid polycarbonate cough screen
  • Bethlem Hospital – Covid storage room
  • Bethlem Hospital – Isolation Room

Accreditations

Services

  • Construction Services
  • Projects & News
  • About Us
  • Contact Us

Projects & News

  • JCOSS School – Library COVID Cough Screens
  • Harris Kenley – new veneer reception doors
  • Bethlem Hospital – Covid polycarbonate cough screen
  • Bethlem Hospital – Covid storage room

Contact Us

CSF Building Contractors Ltd.
47 Woodside
Leigh on Sea
Essex
SS9 4QX
Tel: 01702 525762
Email: info@csfbuildingcontractors.com


CSF's office is powered by
Copyright © 2021 CSF Building Contractors Ltd.. Powered by WordPress. Theme: Spacious by ThemeGrill.
  • Construction Services
  • Projects & News
  • About Us
  • Contact Us