Supply & install 2 Polycarbonate screens approx. 1675×900 & 1610×758 with radius corner & polished edges. 1 screen with cut out & polished edges. All screens to act as COVID screen protection
JCOSS School – Library COVID Cough Screens

Supply & install 2 Polycarbonate screens approx. 1675×900 & 1610×758 with radius corner & polished edges. 1 screen with cut out & polished edges. All screens to act as COVID screen protection
Supply & install a single veneer door & half leaf set between wall left of reception entrance complete with polished white ash frame & glazed borrowed light above frame to be installed from floor to ceiling Supply & install all
Supply & install 1 Polycarbonate sheet screen (clear) to canteen restaurant area. Reduce width of opening above food serving area to take Polycarbonate 3050×835 by fitting 100×25 prepared timber decorated white to either side of opening. The screen will be
Supply & install 6 rows of melamine shelving 600mm deep complete with spur racking, large uprights, joining clips & fixings to run along full length of right hand wall. This room once installed will be used for all COVID PPE
CSF were contacted on Friday 17th of April by our client to clear and install an Isolation Room over the weekend to be ready for use on Monday 20th April. Although it was a small window to complete the project,
Supply, Delivery and Installation of Coronavirus Testing Stations CSF are very proud to have been requested to support the NHS by recently supplying, delivering and installing two Coronavirus testing stations at Bethlem Royal Hospital following a verbal conversation request from
Car Parking Line Refurbishment Re-line car park line markings with thermoplastic paint to parking bays & disabled bays.
Ground Floor Decorations Rub down & prepare all walls, skirting, frames & borrowed light ready for decorations. Apply two coats of Dulux diamond matt emulsion to walls (colour TBC). Apply one undercoat & one top coat (colour TBC) to all
Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion
Phase 3 café & ground floor refurbishment
Newly formed constructed domestic basement dwelling.