A request to install new fire exit doors to the centre.
Cordwell Road – Lewisham Early Intervention Team – New Fire Exit Doors


A request to install new fire exit doors to the centre.

We were asked to replace the floor to the WCs. This work was to be carried out out of hours to avoid disruption to the Health Centre.

Due to a burst water pipe, a request to rectify damage as soon as possible

A request to install a stud wall for a new control panel for a new boiler.

The wash up entrance door requires replacing due to wear & tear.

A request to update and renovate a bedroom in a live psychiatric ward. Professionalism and speed is key for this project.

Another request from the Health Centre. Supply and install a new fire exit aluminium door set into existing opening for staff entrance.

An invitation to decorate and refresh the WC facilities at the Health Centre.

A request to install a new reception screen at St Giles House. This centre provides assessments & short-term treatment for people needing mental health support.

Further to our recent works at Lister. We were asked to repair or replace the doors to the Plant Storage Room and make secure. Remove existing double door set & dispose of.Supply & install 1 aluminium double door set (door

A further request to continue work at the Care Centre. This time, a refurbishment of the lobby and staircase to freshen up the communal areas. Staircases & Lobby Decorations: Erect mobile staircase towers for safe working access.Rub down, prepare all

A request to make good the shower room floor on the 2nd level of the care centre. Uplift existing flooring & dispose of.Prepare & latex sub floor.Supply & lay new Polysafe vinyl flooring (grey) with cap & cove skirting.Heat weld

We were asked to carry out garden maintenance and clearance at a Health Centre. Carry out strimmer removal to exiting overgrown shrubs & bushes. Remove high level grass using lawnmower & strimmer to entire garden area & side alley. Remove

A request to update, repair and replace a kitchen for our customer. A quick turnaround was needed to ensure staff could carry on using while at work.

A request from one of our customers to install new flooring on the front stairs and landing of the health centre.

CSF are pleased to be appointed to turn a green grass area into a relaxing Therapy/Sensory garden for the local community.

To replace flooring, nosings and make safe Health Centres stairs.

To install new reception screens in a short period of time.

A request to repaint the plant room with tanking membrane.

A request to renovate the flooring in the waiting area, reception, office and adjoining corridors

A request from the Health Centre to decorate the corridors and main waiting room.

A request from our client to restore external fire escape stairs and bring back to original condition.

Kenwood Medical Centre – New Fascia repair with decoration.

Woodside Health Centre – Stair Nosings

Gallions Health Centre – Emergency Window Repair

A request to replace the Health Centre front door.

A small project to remove unsightly graffiti and restore to original condition.

We were asked to remove the old, dilapidated fence and replace with new fence panels, Arris rails, kick boards and edge boards.

Croydon University Hospital – Mayday, new kitchen

Request to remove old floor and install new Polysafe vinyl in male and female toilets.

Request to board and make secure property as no longer needed for services.

Request to update, remove and replace fire door to boiler room. FD30 fire door required.

The existing bathroom has bad mould on the ceiling due to bad ventilation, this has got into the slats in the airing cupboard & the grain of the veneer doors. Request to clean, repair and refurbish whole bathroom.

Request to clean and repair roof to make sure no standing water be left on roof. Carry out test to make sure water flowing freely.

Complete refurbishment of both the ladies and gentlemen toilet area at Gatton Place. All works completed within 4 weeks timescale.

To remove old flooring and replace with new polyflor vinyl.

We were requested to renovate and modernise 3 rooms while making sure they meet the required health and safety regulations.

A small project to redraw line markings in the carpark using thermoplastic paint.

A project to remove the existing kitchen and install a brand new up to date kitchen complete with new technology, fixtures and fittings.

A small project to renovate and make better use of an outdoor space.

To supply, build and install new bin store.

To clean and refurbish external staircase.

To remove old splashbacks and install whiterock splashbacks.

To carry out masonry repairs to stairs and fully decorate.

To supply and install two Armco barriers.

Original car park & disabled line markings have faded away & require re-lining.

To remove and replace asbestos ceiling and make room usable again.

Replace and repair Bin Store

To completely replace the bin compound for new.

To supply, deliver & install a galvanised access ladder system from floor for access to roof and a galvanised free standing handrail.

Complete check and restoration of roof.

Light up the Hospital showing solidarity to various communities via different colours.

Lower Clapton Health Centre – New Height Restrictor Barrier

Arjo Bath Therapy Room to Physio Room Conversion

Corridor refurbishment carried out on walls & woodwork.

Refurbish Kitchenette

Complete Renovation of John Scott Health Centre Hall with repair and complete refurbishment of parquet flooring.

Bethlem Hospital Multiple Projects

Fence Panel Replacement, Birches Polyclinic Health Centre

St Leonards Hospital – Male WC Hand Basin Replacement

Ground Floor, Complete Corridor flooring replacement

Laundry room conversion to new Mothers & Baby Unit Kitchenette

To clear, clean and refurbish 3 consulting rooms and make ready for COVID-19 work areas.

To Supply and install a protective sheet screen to canteen area.

To supply and install full shelving and make ready for a COVID-19 PPE storage room.

To clear, install and make ready a COVID-19 Isolation Room. 72 hour timescale.

To supply, deliver and install Coronavirus Testing Stations. 24 hour timescale.

South Lewisham Health Centre refurbishment works

Full refurbishment to the entire SEPT office building

Women Services & Gynaecology Ward

Anti-ligature refresh to Ladywell Unit on Clare, Powell, Hayworth, Wharton & Johnson wards.

Fire exit staircase enclosures & MRI removal of redundant material & recover existing roof.

Maternity ward refurbishment at Lewisham Hospital.