Supply & install 2 Polycarbonate screens approx. 1675×900 & 1610×758 with radius corner & polished edges. 1 screen with cut out & polished edges. All screens to act as COVID screen protection
JCOSS School – Library COVID Cough Screens

Supply & install 2 Polycarbonate screens approx. 1675×900 & 1610×758 with radius corner & polished edges. 1 screen with cut out & polished edges. All screens to act as COVID screen protection
Supply & install a single veneer door & half leaf set between wall left of reception entrance complete with polished white ash frame & glazed borrowed light above frame to be installed from floor to ceiling Supply & install all
Ground Floor Decorations Rub down & prepare all walls, skirting, frames & borrowed light ready for decorations. Apply two coats of Dulux diamond matt emulsion to walls (colour TBC). Apply one undercoat & one top coat (colour TBC) to all
CSF completed multiple projects for Hayesbrook during the summer break. These incuded: Bike Shelter, Court Yard, 868 Perimeter Fencing, Science Classroom full refurbishment. All projects were completed to the academy’s specifications and on time ready for the new school year.
CSF carried out a full redecoration of the school hall from walls, ceiling, woodwork & metal work. Whilst carrying out the decoration we removed existing timber framed windows & installed new aluminium powder coated windows in white with Teleflex openers.
Harris Primary School (Crystal Palace) – Hall Project. 2019 Brief of works completed: Protect flooring & electronic white board. Isolate, disconnect & remove all emergency light fitting & fire alarm containment, wiring & fittings ready to be replaced on completion
Toilet cubicle replacement, floor replacement, wall protection, light replacement & full redecoration.
Refurbishment of Car Park, Art Classroom, Library, Fire Doors.
Full refurbishment to science labs – stripping out existing lighting, plumbing, worktops, flooring and full redecoration to the classroom
Redecoration of corridor and lobby
Swimming pool demolition to create new playground surface
Boys & Girls toilets conversion at Harris Primary Academy, Kent House
Boys & Girls toilet refurbishment at Harris Primary Academy
Redecoration and playground fencing at Meeching Valley Primary School
Redecoration and soundproofing at Hawkes Farm Primary School
Remove existing chain link fence and replace with vandal resistant perimeter fencing
Remove & demolish empty caretaker’s building at Hayesbrook Academy
New brushed stainless steel balustrade at Hayesbrook Academy
Car park resurfacing at Hayesbrook Academy
Redecoration over Ground & 1st floor corridors of Hayesbrook Academy
Fire door works at Harris Primary Academy
Installing removable traffic stainless steel bollards at University College London Hospital
Various works carried out at Harris Academy, Merton
Full refurb of classroom at Hayesbrook School
Conversion of toilet cubicles at Hayesbrook School
Full redecoration of the school gym at Kenley Primary School in Corydon.
Full redecoration and refurbishment service for Benson Primary School in Croydon.
Demolition of nursery at Purley School and installation of car park to maximise space.