Existing steps outside of the building above are fairly steep & require a handrail from the columns both sides of the steps.

  1. Supply, deliver & install new key clamp handrail from the inside of the columns down to the bottom of the steps.
  2. This will be tied into the wall each side behind the columns.
  3. Decorate key clamp handrail with metal paint (black).
  4. Remove waste from site & leave clean & tidy.
Denmark Hill, London – New Key Clamp Handrail