We had a recent request to replace and make safe this paving area and pathway. a quick turnaround needed as this is always in use.
- Uplift existing slabs due to Health & Safety trip hazard currently & place to one side.
- Excavate area to a depth of 180mm below finished level.
- Grade & compact subbase, overlay a Geotextile terram.
- Supply & lay 100mm MOT Type 1 to all levels, falls & consolidate with heavy machine roller.
- Lay existing paving slabs on a new 40mm thick cement mortar bed, all grouted with a dry kiln sand.
- Supply & install 20m new concrete edgings to sides of area to retain paving.
- Remove waste & leave clean & tidy.






Bethlem Hospital – Bishopsgate Pathway