A request to install a stud wall for a new control panel for a new boiler.
- In the plant room where they are having a new boiler fitted & old trough urinal has been uncovered which requires blocking off with a stud wall so the control panel can be fitted to.
- Construct a timber frame to cover the urinal opening, this will go from floor to ceiling height using 4×2 treated timber & 18mm structural ply.
- Once erected the ply front will be decorated with 1 coat of sealer & 2 coats of magnolia emulsion.




Bethlem Hospital – Plant Room New Stud Wall