Project: Redecoration of corridor and lobby
Budget: –
Timescale: – 4 weeks (incl. science lab refurbishment work)
Construction Notes:
- Removed all posters and pictures frames which were placed in a safe area and on completion reinstated.
- Removed existing blue cladding and timber panelling from walls in corridor and small lobby areas on ground and first floor.
- Prepared walls and woodwork ready to receive decoration which made both corridors more brighter from the existing look.