Project: Redecoration of corridor and lobby
Budget:
Timescale: – 4 weeks (incl. science lab refurbishment work)

Construction Notes:

  • Removed all posters and pictures frames which were placed in a safe area and on completion reinstated.
  • Removed existing blue cladding and timber panelling from walls in corridor and small lobby areas on ground and first floor.
  • Prepared walls and woodwork ready to receive decoration which made both corridors more brighter from the existing look.

Images (click to enlarge):

Hayesbrook Academy – Corridor redecoration