Project: Boys & Girls toilets conversion at Harris Primary Academy, Kent House
Budget:
Timescale:

Construction Notes:

We recently completed further toilet conversions over the summer to the boys & girls toilets at Harris Kent House Academy, these were stripped back removing all existing items & carrying out a full re-vamp from new flooring, decoration, funky new colourful cubicles, LED lighting, internal/external extraction leaving a more bright feel on completion for the WC’s which were handed over to the client before the kids came back well ahead of completion deadline.

CSF also carried out a full survey to the Academy regarding installing an upgraded fire alarm system L3 wireless, this was carried out over the summer half term. This included striping out all the redundant system, the design element, CAD drawings, accurate layout, record/zone drawings, new radio cluster communication modules, optical smoke detectors with integrated sounder/beacons, heat detectors again with integrated sounders, manual call points, optical beam detector, commissioning, O&M manual & fire alarm system log book.

Images (click to enlarge):

Harris Primary Academy, Kent House – Toilet conversions + Fire alarm system